Skip to content
Skip the interactive story
AI-PRA / Network-wide risk Explore PRA

AI-PRAProbabilistic risk assessment

See the risk.
Know where
to invest.

Connect asset condition, network dependencies and the consequences of failure. Compare the investments that improve system reliability.

  1. 01
    Understand the systemAssets & dependencies
  2. 02
    Quantify the riskFailure & consequence
  3. 03
    Prioritize investmentCost & risk reduction

AI-PRA / Probabilistic risk assessment

Outage risk,
quantified.

See which equipment can cause an outage, what it could cost, and which investments reduce the risk.

Utility case study200,000 poles & structures

Substation model

From network
to substation.

Each substation is modeled from its actual equipment and connections.

One-line model

From site layout
to one-line.

The same equipment and wiring, as a one-line model for analysis.

01 / Asset reliability

Asset failure
probabilities.

Select a transformer to see its chance of failing this year.

02 / Redundancy

One failure is not
always an outage.

Losing one transformer leaves another supply path in service.

Supply maintained

03 / Risk prioritization

Prioritize by
risk contribution.

Risk weighs the chance of failure against the cost of the outage.

AssetRisk / year

04 / Scenario analysis

Test improvements
before you invest.

See what a more reliable asset is worth before you invest in it.

Expected annual outage cost — Baseline

Next steps

Apply PRA
to your own network.

Explore the PRA application, or talk to our team about your network.

How AI-PRA works

From asset failure
to system risk.

An asset with a high chance of failure is not always the one that matters most. PRA accounts for the connections, backup paths and consequences that determine system risk.

Building detailed models by hand and evaluating failure combinations becomes difficult as a network grows. ATS combines three methods to make that work practical across a network.

01 / Build the system model

Model the equipment.

Computer vision helps represent equipment and its connections in a digital twin of the system.

02 / Connect assets to risk

Connect condition to risk.

Connect the twin to AI-driven asset-management models to assess failure probabilities in the context of the network.

03 / Compute the decision space

Evaluate the combinations.

Improved computational methods for Boolean polynomials help calculate how combinations of failures affect system risk.

Repair, replace or keep in service?

Compare the cost and risk reduction of competing investments. ATS works with your team and data to build the analysis, from one substation to a network with thousands of assets.

Discuss your network

Customer work

Evidence from
customer systems.

ATS reports tens of millions of dollars in risk-cost savings across its risk-analysis engagements.

This figure covers ATS risk-analysis engagements. The studies below describe individual analyses; the interactive story uses demonstration data.

Explore ATS risk-analysis work

“ATS was instrumental in solving a big risk problem for us. We knew our system faced a significant seismic risk, but we didn’t know where exactly we needed to invest to mitigate the risk. With the help of ATS, we determined the exact assets within the system that needed to be replaced to mitigate 80% of the risk, resulting in massive risk cost reductions. ATS clarified the decision space for us.”

Electric Utility ExecutiveCalifornia Utility
Aerospace Technical Services

What comes next?

Talk to our team